20 Lines on Tapovan Vishnugad Hydropower Plant in English
Hello Student, Here in this post, we have posted 20 lines on Tapovan Vishnugad Hydropower Plant in English. Students (Class 1 to 8) who want to know a detailed knowledge about Tapovan Vishnugad Hydropower Plant, then here we have given a detailed view about 20 Lines Paragraph on Tapovan Vishnugad Hydropower Plant in English. This Paragraph is very Simple.
20 Lines Paragraph on Tapovan Vishnugad Hydropower Plant in English
Hope above 20 lines on Tapovan Vishnugad Hydropower Plant in English will help you to study. For any help regarding education Students please comment us. Here we are always ready to help You.
(1) It is situated on Dhauliganga River.
(2) It is in Chamoli District of Uttarakhand.
(3) The plant is expected to generate over 2.5 TWh of electricity annually.
(4) It is a 520MW run-of-river hydroelectric project.
(5) The construction was began in November 2006.
(6) This was constructed by NTPC Limited.
(7) This is now under construction status.
(8) This has Pelton type turbines.
(9) They installed 520MW electricity in the turbines.
(10) Tapovan Vishnugad is NTPC’s second hydropower project.
(11) Power production from the plant was expected to begin in 2012, but sluggish tunnel excavation works and flash floods in June 2013 delayed its inagruation.
(12) NTPC is developing the project at an estimated cost INR 29.
(13) The barrage will be 200meter long and 22 meter high.
(14) It consists four gates.
(15) The height of the gate is 12 meter high and 14meter wide each.
(16) The river water will be diverted into the head race tunnel via a desilting basin.
(17) The HRT will have a diameter of 5.6 meter.
(18) A maximum discharge capacity of 122.2m3/s.
(19) Each shaft will be bifurcated into two branches of 2.6m diameter penstock.
(20) It’s feed the water into the turbine.
Similar Links:-